Pile drive works are now underway for the main supports of the new bridge structure of Kagay-an Bridge. Meanwhile, construction of the new river dike towards Ysalina Bridge is now also in the works. Browse latest aerial photos below.

DCIM\100MEDIA\DJI_0080.JPG
kkihohfd

Here are closer shots.

iikfkf78s

You can already see part of the dike on the left.

aaiwjff
uu7hdd

Construction has been in full swing.

8hfhff4

The bridge work is also part of the JICA-funded Flood Risk Management Project for CDO River.

0of9fs
tty73hd
300def44
8ffffsw
299ddj22

Meanwhile, you can see steel piles along the proposed dike layout from Kagay-an Bridge towards Ysalina Bridge.

a99j33

These steel piles will be the main supports for the proposed dike.

200ddd

This means the area to the right of the current road (Acacia Street) will be outside the dike.

0333jef

Dike construction towards Macanhan area is almost done already.