Only about 100 meters of the Balulang Access Road is left to be concreted before the Balulang-Macasandig Bridge can be finally used by motorists. Check out this aerial update courtesy of TRIP OUTDOOR TV.

Browse some screengrabs below.

Here’s an aerial view of the whole bridge span and approaches.

hgrdd

Only about 100 meters of the Balulang approach remains unpaved.

kjh44
jtrstere
888dhd

The approach is already connected to the Balulang Main Road.

thrt344

This is the same approach looking towards Macasandig area.

tg5w4fe

This is the Macasandig Approach which have been completed much earlier.

5erte5e5
de4dsdf

The bridge already has its lighting fixtures.

kkkjd
is8754efef

This river dike connects to Rodelsa Circle.

etw4rr
bderer
g54vefe
fgeyw54y

Keep posted.

Facebook Comments