Here’s an aerial shot of the 4.46-kilometer Cagayan de Oro Coastal Road (Lapasan-Gusa Section) showing the excavations where the lighting fixtures will be finally installed. Opened in November 2017, motorists had to endure darkness and relied on lights from vehicles when passing at night. The lack of lighting also caused the proliferation of vandalism at the site.

photo by DPWH

Read related post below.

Facebook Comments