Construction continues for the Cagayan de Oro Flood Risk Management Project or most commonly known as the megadike project.

The study area of the project stretches from the mouth of Cagayan de Oro River at Macabalan-Bonbon area towards the south near Pelaez Bridge in Taguanao, Barangay Indahag.

123525928-3806796126018698-4506197494046450913-o

The structures differ in every section of the whole stretch depends on the configuration of the area and the flood levels.

123393317-3806780609353583-3743937154573167454-o

Notable section is the flood wall and 2-lane river boulevard between City Hall and Puntod-Kauswagan Bridge.

123989650-3806790556019255-188007633914355487-o

You can observe the wide area which has been flooded during Typhoon Sendong.

123566239-3806824626015848-7184221558752188608-o

Here’s an ongoing flood wall construction.

124163129-3806821029349541-81099100551946890-o

Keep posted.

all photos by City Information Office

Facebook Comments