Construction of the 33-storey Aspira Tower 2, the tallest under construction building in Cagayan de Oro City is now progressing to the 17th floor. The high rise residential condominium project of Ayala Land under the Avida brand is located along Ramon Chaves Street in the downtown area.

Tower 2 is shown at right with Tower 1 at left.

You can observe the marking on each floor. 12R means it is the 12th residential floor which is on top of the 2-level podium.

You can also observe ongoing construction of the upper floors.

Exterior painting is also ongoing.

Here’s the tower as seen from Ebarle Street.

Aspira Tower 2 is scheduled for completion in 2023.

Keep posted.

Facebook Comments