Just before the rain this afternoon, June 26, a group of people reportedly from the City Engineer’s Office were seen doing some maintenance work along Bitan-ag Creek right beside the carpark of SM CDO Downtown Premier.

As shown, they were removing the accumulated earth and vegetation along the creek which may have contributed to the narrowing of the creek.

Most of these silts were carried by storm runoffs and deposited along the sides of the creek. The vegetation growth indicates the earth have been onsite for a considerable time allowing plant growth.

Facebook Comments