Towers 1 and 2 which comprises phase 1 of the triple tower MesaVerte Residences project by Cebu Landmasters Inc. in Cagayan de Oro City are now steadily rising.

Latest update showed the t-crane is now up onsite.

photo by Eric Dimitri

As shown below, construction is now on the 2nd level for Tower 1 and column works now underway for Tower 2. Both will have 15 floors.

You can see ongoing steel matting of the 2nd floor below of Tower 1.

This is Tower 1 ground level.

The building’s columns are rising.

This is Tower 2 at ground level.

Workers preparing for more vertical works.

Heavy equipment and machinery onsite.

Keep posted.

all photos from cebulandmasters.com

Facebook Comments