A heavy equipment was spotted at the southwest section inside Lourdes College main campus along Capistrano Street in Cagayan de Oro City.

It was gathered construction work is ongoing onsite with excavation work.

img20161225135248

Construction materials were also observed onsite.

img20161225135250

Here’s a rendering of the project we found in Facebook indicating a much modern look of the school building.

15337608_1482582525088716_6750195494286365601_n
image grabbed from Eriq Austin Neri-Melendez Naca-Madriaga’s FB account 

Keep posted.

  • Gene Eric

    Kaya pala inedemolish ang stairs at this side. Renovations has been going on for more than a year with the construction of the ICT labs and central staircase.