ERC okays commercial operations of FDC Misamis’ 405-MW Plant at PHIVIDEC




untitled

The Energy Regulatory Commission (ERC) has given the green light for the start of commercial operations of the FDC Misamis Power Corporation’s 3 x 135 MW Circulating Fluidized Bed (CFB) Coal Thermal Plant located at PHIVIDEC, Villanueva, Misamis Oriental. Mindanao’s biggest base load plant was officially inaugurated by President Rodrigo Duterte in September this year.

More details in Inquirer.net article HERE.

 

Share this post:

Related Posts

One Comment

  1. Bong says:

    Wow no more power interruption…

Leave a Reply