14457423_1170692886324359_3596194516412732859_n
photo by PIA Misamis Oriental

President Rodrigo Roa Duterte yesterday formally switched on the biggest base load power plant in Mindanao, the 405 MW (3 X 135 MW) Coal Thermal Plant of FDC Misamis Power Corporation located at Phividec Industrial Estate in Villanueva, Misamis Oriental. It was the first to be commissioned in his administration which is expected to address the recurring power crisis in Mindanao.

Watch it below.

Facebook Comments