DU30 in MisOr today to inaugurate Mindanao’s largest power plant; to visit Camp Alagar later


photo from brochure

President Rodrigo Roa Duterte will be in Misamis Oriental today to formally inaugurate FDC Misamis Power Corp.’s 405 (3 x 135) MW Circulating Fluidized Bed (CFB) Coal Thermal Plant at Phividec Industrial Estate in Villanueva town. It is so far the largest power plant in Mindanao.

After the inauguration, the President will then proceed to Camp Alagar in Cagayan de Oro City for a command conference with police officials in Northern Mindanao.

More details HERE.

Share this post:

Related Posts


  1. Grahame says:

    So in future no more Northern Mindanao blackouts?

  2. RFM says:

    there is no guarantee because this coal plant supplies not to Northern Mindanao but to the whole of Mindanao. So if there is one or two plants that will conk out, a black out will occur.

  3. Blue says:

    Go Mindanao! 💪

  4. mercy says:

    Amazing. #ProgressivePhilippines

Leave a Reply