PROJECT WATCH: Macasandig-Balulang Bridge Project now underway




Construction of the P285 million Balulang-Macasandig Bridge Project has began.

As shown below, work has began on the Macasandig side.

IMG20160531084534

Two vertical structures are seen at right believed to be the bridge’s main support.

IMG20160531084544

The bridge is located right beside the ongoing river dike project (LINK).

IMG20160531084558

Closer shot of the bridge support.

IMG20160531084644a

Keep posted.

Share this post:

Related Posts

One Comment

  1. Willy says:

    Nice

Leave a Reply