PROJECT WATCH: T-crane now up for New Dawn Pensionne Expansion Project




Construction of New Dawn Pensionne Expansion will speed up anytime now that the installation of the tower crane has been completed.

As shown, the structure is now very visible as you cruise along Don Apolinar Velez Street, Cagayan de Oro’s main thoroughfare towards city proper.

IMG_5393

IMG_5396

IMG_5392

The tower crane has the marking “ZTC”. After googling it, it could refer to Sichuan Zhongxing Machinery Manufacturing Co.,Ltd (ZTC), a known China-based firm specializing in the design, manufacture, sale and service of tower cranes. Read it HERE.

IMG_5397

The t-crane is mounted on the 5th floor.

IMG_5399 IMG_5403

Keep posted for updates.

Share this post:

Related Posts

4 Comments

  1. Davarkags says:

    wow! kanus-a ang target completion date ani?

  2. CommanderCocs says:

    waw supir wandirpul! I lab it! 😀

  3. Carmenanon says:

    Target completion on dec 2018

Leave a Reply