Construction of the 18-storey New Dawn Pensionne Expansion building is now progressing to the 4rd level. As shown, the 4th level is technically the 3rd floor as the 2nd level is the mezzanne.

IMG_3649 IMG_3651

We could assume by middle of 2016, it could be as tall as CDO Polymedic Hospital.

IMG_3652 IMG_3654

Keep posted for updates.

Facebook Comments