It looks like there’s a change to the Centrio-Gaisano pedestrian overpass project with some work now observed at the main entrance of Gaisano Mall.

As shown below, construction is underway for the base support on the Gaisano side. It can be recalled that last September (Read LINK), the position on the other side was near the eastern section of Centrio and passed Nazareno Church. Will the overpass be perpendicular to CM Recto or will it be a much longer one (diagonal). Meanwhile, the original site at Centrio we posted last September is now covered with soil. Below are photos taken last night at the Gaisano side.

IMG_1501 IMG_1502 IMG_1503 IMG_1504

Meanwhile, here are photos taken this morning.

IMG_1508 IMG_1509 IMG_1509a

IMG_1507

Facebook Comments