More heavy equipment including a pile driver are now at the project site of MesaVerte Residences, Cebu Landmasters Inc.’s first high rise residential condominium complex in Cagayan de Oro City.

As shown, site preparation has been done and the heavy machinery now positioned on the far end (eastern section) of the property where the first 15-storey tower will rise.

IMG_0960 IMG_0961

The entire area is fully enclosed with concrete perimeter fence.

IMG_0962

You can see Limketkai Center and SM CDO2 Premier in the background.IMG_0963

Here are closer shots of the equipment.

IMG_0964 IMG_0965

Local construction firm UKC Builders Inc. seemed to have been commissioned for the pile driving works.

IMG_0965A IMG_0965B

Phase 1 covers the first two 15-storey buildings which will rise on the area where the equipment are positioned.

IMG_0966

Meanwhile, the entrance from President Osmena Extension is now being cleared.

IMG_0957 IMG_0958 IMG_0959

 

We expect these towers to rise steadily in the latter part of next year.

Facebook Comments