Work on the P60 million Sapang Bridge project along the National Highway in Bulua, Cagayan de Oro City is now in full swing.

As shown, ground works are underway onsite with stockpiles of aggregates and construction materials. Flooding has been a perennial problem along this section of the highway as the Sapang Creek usually overflows during heavy rains.11755751_602200743255897_7462506667606606959_n IMG_8426 IMG_8426a

 

with photo from Choose Cagayan de Oro

Facebook Comments