The use of pre-fabricated materials as partition walls has accelerated the construction of Centrio Tower which is now on the 8th floor.

As shown, work on the 8th floor ceiling as well as 9th level flooring is underway. Steel columns are still rising 3 more floors up.

IMG_3813 IMG_3814 IMG_3815 IMG_3816 IMG_3817 IMG_3818 IMG_3819 IMG_3820 IMG_3821 IMG_3822

Facebook Comments