Construction of the 23-storey Centrio Tower has now reached the residential floors.

As shown, the main columns have reached up to the 3rd and 4th floors. The first 2 floors are parking levels.

IMG_0679 IMG_0680 IMG_0681 IMG_0682 IMG_0683 IMG_0684 IMG_0686 IMG_0687

Facebook Comments