Filinvest Development Corp. (FDC) has allocated some P9 billion for the construction of FDC Utilities Inc.’s 405-megawatt (MW) power plant in Misamis Oriental that is scheduled to start operations in 2016.
Read more HERE.
Filinvest Development Corp. (FDC) has allocated some P9 billion for the construction of FDC Utilities Inc.’s 405-megawatt (MW) power plant in Misamis Oriental that is scheduled to start operations in 2016.
Read more HERE.