With Limketkai Luxe Hotel (Tower 1) now preparing for the Golden Abunadance Feast of Chinese New Year, the Limketkai & Sons Group meanwhile is focusing on finishing the podium for Tower 2.

As shown, interior and exterior works are continuing at the project site including the perimeter drainage. The pool for the hotel complex is situated on top of this semi circular structure.

IMG_4302 IMG_4303 IMG_4304 IMG_4305 IMG_4306 IMG_4307

You could see some landscaping along the lower ground floor of the podium.

IMG_4309 IMG_4310

Chutes for construction wastes are also seen.

IMG_4311 IMG_4313 IMG_4314

Meanwhile, a huge signage is now being installed at the back side of the hotel.

IMG_4374 IMG_4375 IMG_4375a

The podium sits on a foundation which is designed to support the 35-storey second tower. Now, latest info is that the management is currently looking at the performance of the first tower (hotel) so they can decide on the future use of the second tower.

IMG_4379 IMG_4381

Facebook Comments