moresco1

A 10.5 MW bunker fired power plant will soon rise in El Salvador City, Misamis Oriental specifically to address generation requirement of Misamis Oriental-1 Rural Electric Service Cooperative Inc. (Moresco-1).

The power plant will be developed and operated by PACERM-1 Energy Corporation and costs P747 million. It is expected to go online by 2014 supplying peak load requirements from 6 p.m. to 10 p.m. See below some technical info (SOURCE).

moresco

Read more HERE.

Facebook Comments