Foundation works are still ongoing for Centrio Tower, Ayala Land’s first high rise condominium project in Cagayan de Oro City.

As shown, several cranes, and other heavy equipment are still onsite for the foundation works which could still last for a few more weeks before vertical construction begins.

_MG_7412 _MG_7413 _MG_7414

A personnel perhaps from the foundation contractor oversees the works.

_MG_7415

His shirt has FOUNDATION printed on his back…

_MG_7415a

Here’s a closer look of the foundation works.

_MG_7416 _MG_7417 _MG_7418

To understand this method of foundation works, see the simple illustration below. Phase 1 – drilling; Phase 2- withdrawal and concreting and Phase 3: steel cage installation.

 

pile_foundation_Continuous_Flight_Auger

You could see “Phase 3” with several steel cages already installed below.

_MG_7419

A lot of steel bars for the steel cages are still onsite.

_MG_7420 _MG_7421 _MG_7422 _MG_7423 _MG_7424 _MG_7425 _MG_7426 _MG_7427

From the looks of it, vertical construction could start by the 3rd quarter of this year.

Facebook Comments