Construction of the extended river dike is now being prioritized at Paseo del Rio.

As shown, sheet piles are already in place along the riverbank with aggregates and other materials now onsite for the purpose.

[000005]  [000007] [000008] [000009]

Meanwhile, construction of the hotel will continue once the river protection structures are in place. Accordingly, the Pelaez Group is prioritizing the opening of the Convention Center this year, then the mall and finally the hotel.

[000006][000010]

Facebook Comments