Construction of MUST’s Engineering Complex are well underway as heavy equipment are now onsite.

As shown in the following pictures, a huge tarp showing the rendering of the proposed educational facility is displayed for passing motorists to see.

IMG_5251 IMG_5252 IMG_5252a

The old building next to the former gate is currently being demolished while pile drivers are being positioned.

IMG_5253 IMG_5254 IMG_5255

And again, CDO-based UKC is contracted for the project.

IMG_5256

Facebook Comments