With the acquisition of the required papers, Primavera Residences Tower B is now under construction.

They are now posting the tarp of those official permit from HLURB as shown below.

Meanwhile, a backhoe is seen doing some excavation at the Tower B site.

In case you haven’t noticed it yet, the T-crane was already moved to its present position a month ago. It used to be just beside Tower A.

There are now some structures being built at the southern portion of the site perhaps for field office.

Primavera residences as viewed from SM carpark.

photos and text by nooboon

 

Facebook Comments