Construction of Granvia Suites has now reached the 4th floor.

As shown in the pic above, a T-crane is also being installed indicating that Johndorf Ventures, the project developer is bent on finishing the 7-storey condominium soonest.

A notice from HLURB is posted onsite.

Gran Via – why the project is so named…

The project with Granvia Residences and Primavera Residences nearby.

A closer look at the construction. Parts of the T-crane to e assembled are still onsite.

Facebook Comments