Heavy equipment are now at the site of the future Ayala Mall in Cagayan de Oro City. UKC Builders, a popular local construction firm was reportedly contracted to make the pile driving of numerous concrete piles in the entire 3.2-hectare Floirendo property. So far the name of the mall has not been released to the public yet but sources state it has relevance to the two acacia trees inside the property.

The sightings of these equipment signal the start of the construction of the much awaited project, a joint venture between Ayala Land and the Floirendo Group. Next to this will be the delivery of the concrete piles which will also be supplied by UKC. Pile driving will take at least 2-3 months with vertical construction expected to begin early next year. More photos below (taken from Gaisano Mall Foodcourt). Click photos to enlarge.

Facebook Comments